I’d given myself 1 day to sand the window trim on the final 3 windows to make them flush, flat and smooth, plus do the caulking and puttying, then painting 2 coats of primer, and 2 coats of final paint. It took 3, maybe 4 days, but they’re are finally done, except for cutting and installing the shades. I had to sand down 1/16th of an inch on at least six joints to get the casing flush (!). That took awhile.
Anyway, I think they look smashing!
Next up — finalizing the design of the daybed and cabinet, then building it. 🙂
I may take the weekend off to paint paintings. It’s been so long, but we’ll see…Got a bad case of get-it-done-itis.